(Ticaret) (demand over lead time) The projected usage of a component or other material over the replenishment lead time. A predictable usage rate is assumed when calculating lot sizes and reorder levels based on lead time demand
A heavy, stupid fellow; a blockhead; a numskull; an ignoramus; a dunce; a dullard
disapproval If you call someone a dolt, you think they are stupid, or have done something stupid. = idiot. a silly or stupid person (Perhaps from dold (1400-1500))