(Telekom) commissioning
An activity commenced at completion of construction and often including initial user occupancy, intended to allow designers and managers to check functional subsystems, to determine that the facility is functioning properly, and to undertake any necessary remedial action Commissioning typically spans a period of 6 to 12 months
Buying and ensuring the maintenance of care tailored to local needs
The process at or near construction completion when a facility is put into use to see if it functions as designed Usually applied to manufacturing type projects, and similar to Beneficial Occupancy in the commercial sector
Start-up of a building that includes testing and adjusting HVAC, electrical, plumbing, and other systems to assure proper functioning and adherence to design criteria Commissioning also includes the instruction of building representatives in the use of the building systems
(Mise en service) - This is the formal handover of operational responsibility and maintenance responsibility for the end-product of the project from the project manager to the departmental operational and maintenance authorities, respectively The commissioning documents normally include an agreed listing of operational and maintenance deficiencies, together with an agreed plan for clearing up these deficiencies
Arranging for care or health services to be provided, either for an individual or for a group of service users
Gerund of commission
Present participle of commission
A process for achieving, verifying and documenting the performance of buildings to meet the owner's functional criteria, including preparation of operator personnel
This is the process that PCTs go through to agree health services which a provider (such as an NHS Trust) will provide for a specified sum of money Commissioning also involves monitoring these contracts to ensure best value for money
the act of granting authority to undertake certain functions
the testing of HVAC systems prior to building occupancy to check whether the systems meet the operational needs of the building within the capabilities of the system design
The process by which the health needs of the population are defined, priorities determined and appropriate services purchased and evaluated
The final adjustment, setting and balancing of an HVAC system (typically) to match the specification and design intention requirements
Commissioning can be subdivided into three major activities; installation, operation and performance qualifications It is a formal, written procedure to the planning, executing and documenting of facility validation This process may include environmental compliance checks, verification of personnel protection equipment and qualification of containment systems as well as validation of systems related to cGMP regulations
Obtaining and documenting evidence that equipment has been provided and installed in accordance with its specification and that it functions within predetermined limits when operated in accordance with the manufacturer's instructions
Is a basic four-part processing verifying: the review of the project program through design and construction, the interaction and training process for facility personnel, the correction of project deficiencies, and the recordation of warranties and guarantees
The process whereby a PCT arranges for health services to be provided to a local population and fund these services
The process by which a leadership team approves the development of a new team Commissioning involves defining a purpose, clarifying important guidelines, establishing a reporting process and identifying the team leader
is the phase during which the capabilities of the system are demonstrated in the final operational configuration under defined operating conditions During commissioning, both verification and validation tests are performed on the complete system