nsee engineering change order

listen to the pronunciation of nsee engineering change order
Английский Язык - Английский Язык

Определение nsee engineering change order в Английский Язык Английский Язык словарь

engineering change order
(Ticaret) (ECO) A formal document that has been signed off by the affected departments and authorizes product definition changes to a drawing, bill of material or routing. It often ties to system planning, scheduling and cost functions by specifying an effectivity date for the items included
engineering change order
eco
engineering change order
eco-
nsee engineering change order

    Расстановка переносов

    nsee en·gi·neer·ing change or·der

    Произношение

Избранное